KARACHI: Jamshoro Joint Venture Limited (JJVL) on Thursday announced to increase its liquid petroleum gas (LPG) production by 100 tons/day to 400 tons/day.
Following a steep reduction of LPG availability in the country owing to the shutdown of some oil refineries and reduced production by Oil and Gas Development Company (OGDCL), JJVL was making an all-out effort to increase its production to meet requirements of over 500,000 homes which are not connected to the national gas grid.
JJVL Chairman Iqbal Z Ahmed visited the JJVL Plant, located in Deh Shah Bokhari, to ensure that there were no impediments to a sustained LPG supply chain countrywide by maintaining optimal production at the JJVL plant.
“The current production, at JJVL, of over 300 tons per day is expected to increase to over 400 tons per day shortly, thus saving Pakistan millions of dollars in foreign exchange and providing energy to the far-flung areas of the country and the underprivileged,” a statement said.
JJVL represents a replacement value of $200 million and can process 325 mmscfd of gas per day. To date, since 2005, JJVL has produced over 1.6 million tonnes of LPG and over 600,000 tons of NGL.
The sun is seen behind a crude oil pump jack. — Reuters/FileISLAMABAD: Petroleum Exploration Limited , a leading...
This representational image shows a person holding gold necklaces. — AFP/FileKARACHI: Gold prices decreased by...
A Dior sign is seen in a shop with the Church of Santissima Trinita dei Monti and the Spanish Steps in the background,...
A view of containers moving towards the destination. — PPI/FileLAHORE: Trade liberalisation, which was meant to...
An EV standing at a charging station can be seen. — AFP/FileLONDON: The UK car industry sold a record number of...
The annual Consumer Electronics Show logo can be seen. — AFP/FileLAS VEGAS: Gadgets, robots and vehicles imbued...