KARACHI: Oil and Gas Development Company (OGDC) on Thursday announced the start of production from its Kunnar West Well-3, situated in the Hyderabad district of Sindh.
According to a company statement, the well was brought into production at a wellhead flowing pressure (WHFP) of 1,200 PSI using a 32/64” choke size. It is currently yielding 3.5 million standard cubic feet per day (mmscfd) of gas, 30 barrels per day (bpd) of condensate, and 3.8 metric tonnes per day (MTD) of liquefied petroleum gas (LPG).
The gas output has been seamlessly integrated into the Sui Southern Gas Company Limited (SSGCL) network, enhancing the country’s energy supply.The Kunnar West Field is part of the kunnar mining lease, located in Hyderabad, Sindh and is operated solely by OGDC, which holds a 100 per cent working interest. This achievement highlights OGDC’s dedication to operational excellence and sustainable energy development. By leveraging innovative technologies, the company continues to strengthen its position as a leader in the hydrocarbon sector.
Nissan Motor CEO Makoto Uchida and Honda Motor CEO Toshihiro Mibe attend press conference in Tokyo. —...
Samiullah Siddiqui, Chairman PAIB committee and council member ICAP addressing the event. —...
The representational image shows a person holding gold necklaces. — AFP/FileKARACHI: Gold prices rose by Rs2,100 per...
US President-elect Donald Trump speaks to attendees during a campaign rally at the Mosack Group warehouse in Mint...
A representational image of a tax files. — Pixabay/FileLAHORE: The notion that Pakistan’s corporate sector is...
President of the Karachi Chamber of Commerce & Industry Muhammad Jawed Bilwani can be seeen in this photo released on...